Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
01/08/2024 ENGR Engineering Final Partial Pass contractor needs to install the gate, going into the backyard and pour a piece of sidewalk. And remove construction material in the front of the house.
01/16/2024 ENGR Engineering Final Partial Pass Contractor needs to finish the pony wall, going into the front door.
01/18/2024 ENGR Engineering Final Not Ready front entrance screen wall not complete. black sewer clean pipes need lowering so only caps are at grade.
02/21/2024 ENGR Engineering Final Passed