Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSPL - Rough Soil 

Permit Number - TC-MDP-0223-00509

Inspection Description - COT - RSPL - Rough Soil 

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
05/02/2023 COT - RSPL - Rough Soil  Re-inspection required 5/2/23: rocky soil conditions. Over-ex 2x pipe diameters and bed pipe in approved material. Approved shading material required on site.Yard water line not on test.
05/08/2023 COT - RSPL - Rough Soil  Passed