Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 08/07/2023 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
Fully fill stack up to 5' of water, fully fill all dwv plumbing with water, rocky soil remove all big rocks and clumps of hard dirt from footings. |
| 08/08/2023 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
Fully fill stack up to 5' of water, fully fill all dwv plumbing with water, rocky soil remove all big rocks and clumps of hard dirt from footings. |
| 08/16/2023 |
COT - RSPL - Rough Soil |
|
Passed |
|