Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0223-00444
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Missing clean out in kitchen pantry, nail plate needed right side of garage, open chase left side of garage, can lights must be 12” away from water lines or insulate water lines, top plate in kitchen pantry over notched and needs bang plate and foam, add nail plate at top plate for 220v wire for range, bed. 2 staple wire needed and fix wiring, bang plate needed for vent in bath. 3, support 4-gang box in loft, connect and secure furnace line in loft ceiling, nail plates needed in loft, nail plates needed in master bedroom, support 4-gang box in master bathroom. | |
10/27/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | nail plate needed right side of garage, open chase left side of garage, can lights must be 12” away from water lines or insulate water lines, top plate in kitchen pantry over notched and needs bang plate and foam, add nail plate at top plate for 220v wire for range, missing wiring for second receptacle in island, complete back porch wiring in outlet receptacle, no ufer connection, gas bond?, leak in dwv at ceiling of family room, bed. 2 staple wire needed and fix wiring, bang plate needed for vent in bath. 3, support 4-gang box in loft, connect and secure furnace line in loft ceiling, nail plates needed in loft, nail plates needed in master bedroom, support 4-gang box in master bathroom. | |
10/31/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | open chase left side of garage, can lights must be 12” away from water lines or insulate water lines | |
11/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |