Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-MDP-0126-00028

Parcel: 141155840


Addresses:

10030 E LEBARON

Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
07/20/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 7/20/2026 Kitchen hood not installed. Secure gas line in place. Thermostat not at proper height. Provide 18” min from first sweat joint at main water line before transitioning to pex. Seal of any tares in ductwork throughout.
07/23/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready Tares at duct remaining throughout. Secure low voltage at kitchen areas. Provide ko seal at range box. Conduit at kitchen island shall be in pony wall and sealed. Provide proper size of cold water lines of pex. 3/4" per plan. Provide nail plate at backyard hose bib. Staple electrical line near SGD along with nail plate at top plate. Provide nail plate at condensation line. Staple electrical lines in north bedroom behind garage. Secure gas line at every 10'. 7/23/2026
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 8-5-26 Provide proper size of cold water lines of pex. 3/4" per plan, Provide ko seal at range box, seal vapor barrier at Southwest corner bedroom as well as right of garage door entry also above sliding glass door throughout
08/11/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 08/11/2026
Corrections made.