Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 09/28/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
9/28/26: fire foam penetrations at marked areas, tape tears to flex, add supports to flex at 4' intervals, seal above ceiling horizontal penetrations at SW north of stairs, pancake box above island not grounded, add plumbers tape to dwv where using blocks as supports, insulate hot pex lines larger than 3/4", add supports to kitchen exhausts within 2' of a bend and again at 4' intervals, replace drywall screws to attach to metal electrical boxes, add a Boca plate at kitchen lavatory, attach nail plate adjacent to kitchen exhaust, Stopped inspection-2nd floor not walked. Additional items may be noted. |
| 09/30/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
9/30/26: missing fire foam at top plate of 1st floor restroom, fire foam penetrations from an unconditioned space to conditioned area at garage-see marked areas to include SW penetration and DWV, provide support to HVAC duct at 1st floor-flex must be lifted so that drywall can be installed-see marked area, tape tears to flex at marked locations, seal decking behind tub upstairs, missing ground at upstairs bathroom's pancake box, seal vapor barrier throughout downstairs/ upstairs, seal upstairs chute at master bathroom and decking penetration at marked locations, lower thermostat height to 48" o.c., provide a support for gas line at laundry room and at kitchen, seal decking at upstairs condensation line, seal duct chute at upstairs decking, provide upstairs supports on bathroom exhaust and HVAC exhausts above ceiling in attic |
| 10/09/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
10/9/2026 approved. All corrections were made. |