Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2025 | ENGR Engineering Final | Not Ready | Gas meter location blocks east side gate access. Once meter is installed, gate will not open. West wall cap is loose @ gate post. Sewer cap missing from driveway. |
|
| 07/01/2025 | ENGR Engineering Final | Passed | Site is safe and in accordance with approved plans. CofO ready. |