Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2025 | COT - RSPL - Rough Soil | Re-inspection required | 24 March 25 Plumbing not under test and no plans on site . |
|
| 03/25/2025 | COT - RSPL - Rough Soil | Re-inspection required | 24 March 25 Plumbing not under test and no plans on site . 3/25/25: shading required for rough plumbing, remove all rocks under ABS, possible leak at Water closet test stack location (wet soil conditions in that area and stack is not filled to the 5' for static pressure) |
|
| 03/26/2025 | COT - RSPL - Rough Soil | Partial Pass | 3-26-25, partial pass on underground plumbing inspection-Okay to backfill with shading materials. Greywater will be checked at intermediates. | |
| 05/20/2025 | COT - RSPL - Rough Soil | Passed |