Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-MDP-0125-00015
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2025 | ENGR Engineering Final | Not Ready | 9/25/25 Screen wall on North side of house is not built. The offset between the wall to the south and the house is less than 3.3'. Weep blocks need to be installed every 10 ft minimum at East screen wall per plan. |
|
| 12/08/2025 | ENGR Engineering Final | Partial Pass | Contractor still building here, not ready for an engineering final. Vehicles in the roadway, obstructing emergency vehicles. The roadway needs to be cleared at all time. |