Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 10/02/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
10/2/24: Anchor bolt spacing not per plan throughout, MASA clips not properly fastened, Multiple MASA clips with 1 leg up on a set of 3, King/Trimmer stud at SGD not per plan, porch columns must be properly secured, shear-walls not fastened per schedule at first fl floor and second floor, shear-walls wall sill plate attachments not per schedule at second floor, balloon framing requires blocking at 10', rsp4 at second floor not per plan, roof sheathing not properly fastened, great room opening studs must be properly supported on sill plate. |
| 10/07/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
great room opening studs must be properly supported on sill plate. Missing anchor bolts at all marked areas. rsp4 at second floor not per plan. 10/7/2024 |
| 10/11/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
corrections were made. 10/11/2024 |