Inspection History Details
Inspection Status: Canceled
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2024 | RSBU - Building Final | Canceled | ||
| 10/02/2024 | RSBU - Building Final | Re-inspection required | 9-20-2024,contractor cancelled inspection and will reschedule when ready. 10/2/24: clean out at drive way required, main panel cover not properly fastened, Pressure relief valve must terminate 6" above grade. 3" clearance required from grade to A/C condenser, receptacles at back door have no power, light at back door entry has no power, properly support refrigerant lines in attic. |
|
| 10/04/2024 | RSBU - Building Final | Passed | 10/4/2024 per previous notes. |