Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0124-00005

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Not Ready

Date Description Inspector Results Comments
04/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
06/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required DWV not under test, missing metallic flex conduit in garage, copper piping not connected at water service front porch, no water in shower pan, stopped inspection. Reinspection required. More items may be added.
06/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Secure thermostat wire. Add blocking to register near fresh air intake. Missing nail plates to both plumbing and electrical lines. Seal off exterior penetrations along with a hole going through the second floor at closet and metallic piping top plate. Possible leak at shower pan due to wet surfaces. Provide set of approved plans for the time of inspection. 6/24/2024
06/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 6/27/2024