Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2023 | COT - RSME - Mechanical Final | Re-inspection required | Base of a/c requires 3" clearance from earth, a/c is over fused. | |
| 08/03/2023 | COT - RSME - Mechanical Final | Passed |