Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Not ready. | |
| 04/18/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4/18/23 apex too close to can light. Support duct work off recessed cans. Duct work not attached to register. Register not blocked on 3 sides. Electrical optional ceiling fan and light needs 14/3 wire. STOPPED INSPECTION. | |
| 04/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Not ready. 4/18/23 apex too close to can light. Support duct work off recessed cans. Duct work not attached to register. Register not blocked on 3 sides. Electrical optional ceiling fan and light needs 14/3 wire. STOPPED INSPECTION. 4/20/23: 4 over-notched bearing wall studs (let-ins), water test shower pan, line set not connected, install anchor bolts within 12" of end of all shear walls. |
|
| 04/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |