Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 05/01/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Block registers, over notched 2x6 stud at powder room, add nails to hangers by stairs, add blocking at chase behind electrical panel and fire foam top plate, dwv not under test, tub not under test, duct register missing at second floor bedroom, plumbing not per plans. |
| 05/01/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Block registers, over notched 2x6 stud at powder room, add nails to hangers by stairs, add blocking at chase behind electrical panel and fire foam top plate, dwv not under test, tub not under test, duct register missing at second floor bedroom. |
| 05/03/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
GEC not connected to ufer. Plumbing not per P1 plans. Missing clean outs. Make proper corrections according to plans or revise plans showing current layout of plumbing work done and provide updated city stamped plans at Final. Everything else is ok. Check ufer connection at TEMP. Power. Partial-pass. |
| 05/03/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
GEC not connected to ufer. Plumbing not per P1 plans. Missing clean outs. Make proper corrections according to plans or revise plans showing current layout of plumbing work done and provide updated city stamped plans at Final. Everything else is ok. Check ufer connection at TEMP. Power. Partial-pass. |
| 07/31/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|