Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0123-00252
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Add nail plate to orange conduit, staple wires behind garage shear walls, garage missing outlet, missing staple wires at kitchen, tape duct work in attic ducts, fire block duct chase, foam top plate of sink vent in bathroom, attic access must have 30” clearance of headroom space throughout, nail plates needed in laundry, all laundry receptacles to be GFCI 20amp 12 gauge wire. Plumbing and Electrical work not per plans. Revise plans to show current layout of plumbing and Electrical and show at Final. | |
11/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Add nail plate to orange conduit, staple wires behind garage shear walls, garage missing outlet, missing staple wires at kitchen, tape duct work in attic ducts, fire block duct chase, foam top plate of sink vent in bathroom, attic access must have 30” clearance of headroom space throughout, nail plates needed in laundry, all laundry receptacles to be GFCI 20amp 12 gauge wire. Plumbing and Electrical work not per plans. Revise plans to show current layout of plumbing and Electrical and show at Final. | |
12/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Not ready. Check house for code compliance before calling for inspection. | |
12/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Not ready. Check house for code compliance before calling for inspection. | |
12/04/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/4/23: Bang plates have been installed to protect wiring, fire caulk installed in both air duct chases, laundry receptacle has been changed to 12 gauge wire, and ductwork has been moved from blocking attic access. Okay to proceed with drywall installation. |