Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 141435070


Addresses:

6635 E VIA OLMEDA


Inspection Status: Partial Pass

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0123-00234

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Partial Pass

Date Description Inspector Results Comments
04/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Missing plans, Eletrical and plumbing not per plans. Missing revised city stamped plans of current electrical and plumbing layout per Residential Intermediate inspection notes, provide ladder for attic access, provide manufacturer specs of working clearances for a/c condenser.
04/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required GEC not connected or present, properly secure gas line in laundry, duct work in attic not complete, tape ducts with tears, plumbing not per plans, missing cleanouts, electrical not per plans refrigerator must run on its own circuit, secure light switch at office, support duct registers on three sides.
12/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Plumbing not per plans, missing cleanouts, electrical not per plans refrigerator must run on its own circuit. Proceeding will be at risk. Update plans to show current layout of plumbing and electrical work done and provide updated city stamped plans at final.