Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0123-00211

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
01/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required
01/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Missing clean outs throughout. Plumbing not per plans. Provide updated city stamped plans of current plumbing layout at final. Confirm refrigerator running on its own circuit at final. Partial-pass. Proceed at risk.
12/29/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Refrigerator must run on its own circuit, awaiting low voltage to be installed, tape all tears in ducts, missing cleanouts throughout, complete install of refrigerant line hanging at loft in second floor, nail plate needed at second floor hallway, fresh air intake to be 10’ away from DWV vents, primary condensate line double trapped, furnace flu pipe must to in an upward pitch continuously, insulation cannot be used as Fireblock. Remove insulation and properly Fireblock ducts inside of chases.

complete install of refrigerant line hanging at loft in second floor, fresh air intake to be 10’ away from DWV vents, furnace flu pipe must to in an upward pitch continuously,