Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0123-00205
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Pex lines must be 18” away from next soldered joint at water hose and water heater appliances per M2105.10.2., gas not under test, plumbing not per plans. Missing cleanouts throughout, add nail plates to kitchen sink drains and at sole plate right side of range behind 3” pipe, shower pan not under test, dwv not under test. Potential leak at next gen suite.Stopped inspection. More items may be added. | |
04/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Plumbing not per plans. Missing cleanouts throughout., shower pan not under test, dwv not under test. | |
04/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Plumbing not per plans. Missing cleanouts throughout., Electrical not per plans. Refrigerator must run on its own circuit per E1 plans, shower pan not under test, dwv not under test. | |
08/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |