Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
08/10/2026 ENGR Engineering Final Not Ready 4" Sewer clean outs are not capped with pvc collars and plug caps. Multiple clean outs are in the side walks at perimeter of building and are completely open and covered with incorrect drain emitters. The intended brass covers need to be placed over the correct pvc caps . There are also 6" Sewer clean outs at the North and west entryways. These are also left open and not capped. These also need to be correctly capped and covered with intended brass cover plates.
08/14/2026 ENGR Engineering Final Partial Pass 8/14/26
Site is complete and clear except for the sewer cleanouts not being finished. Okay to apply for level 4 TCO while this is addressed.