Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 05/01/2026 |
COT - LCBU - Framing |
|
Re-inspection required |
Ensure kickers are per plan along with pins. 5/1/2026 |
| 05/27/2026 |
COT - LCBU - Framing |
|
Partial Pass |
In wall at partition walls throughout. Approved.Pending perimeter wall adjacent to common area hallway. Pending office room 147 along with entry and foyer. Still need to verify pony walls. Okay to proceed with all other progress areas. Ensure kickers are in place prior to above ceiling inspection. 5/27/2026 |