Inspection Status: Not Ready

Inspection History: COT - LCBU - Stem Wall/Retaining Wall 

Date Description Inspector Results Comments
07/02/2026 COT - LCBU - Stem Wall/Retaining Wall  Not Ready Footer for retaining wall behind lots 21-23.
#4 Rebar reinforcing is correct in number of verts and horz and OC spacing. The dimensions of the 90 degree bars are not correct-1'-8" both legs. The footer depth dimension is not correct to get correct clearance from dirt with this 1'-8". Rebar needs to be 3" of clear of dirt. Rebar should be supported with dobies and or suspended. Support bars should not touch dirt.
07/08/2026 COT - LCBU - Stem Wall/Retaining Wall  Partial Pass 7/8/26 Contractor addressed concerns for footer behind lots 21-23 and will send pictures for me to okay before pour showing all clearances to dirt are good. Before grouting walls schedule pregrout inspections starting at first lift for us to check reinforcing and roughened construction joint. Before backfilling reschedule inspection for us to look at rock pocket, 3" weep holes and porous backfill per ADOT spec. noted on detail.
07/16/2026 COT - LCBU - Stem Wall/Retaining Wall  Partial Pass Okay to poor footer of Retaining wall behind lots 24-26
weather permitting.
07/29/2026 COT - LCBU - Stem Wall/Retaining Wall  Not Ready Retaining wall sections are engineered and designed as cast in place concrete walls.
09/08/2026 COT - LCBU - Stem Wall/Retaining Wall  Partial Pass Rebar is correct to detail B page S1 for wall number 3. Send pictures of correct spacing of rebar 2 inches to form that I talked about with contractor and OK to finish forms.
09/25/2026 COT - LCBU - Stem Wall/Retaining Wall  Partial Pass Okay to backfill wall. Reschedule inspection for rock pockets at weep holes.