Inspection Status: Re-inspection required

Inspection History: COT - LCPL - Plumbing Final 

Date Description Inspector Results Comments
08/07/2026 COT - LCPL - Plumbing Final  Re-inspection required
08/12/2026 COT - LCPL - Plumbing Final  Re-inspection required 8.12.26
1. Missing water hammer arrestors on washer machine.
2. Drain pan too small
3. PRV line needs to be CPVC or copper.
4. Missing smoke detectors and carbon monoxide detectors.
09/04/2026 COT - LCPL - Plumbing Final  Passed