Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2026 | COT - LCPL - Plumbing Final | Re-inspection required | ||
| 08/12/2026 | COT - LCPL - Plumbing Final | Re-inspection required | 8.12.26 1. Missing water hammer arrestors on washer machine. 2. Drain pan too small 3. PRV line needs to be CPVC or copper. 4. Missing smoke detectors and carbon monoxide detectors. |