Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 06/04/2026 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
6/4/26: Electrical underground at slab approved ok to proceed with slab prep |
| 07/30/2026 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
7-28-26: verified 2-4" Schedule 40 electrical conduit stub ups for main panel & 4-1" Schedule 40 secondary electrical conduit stub ups all located on southeastern section of building. Okay to backfill approximately e0' of open trench using shading materials. |