Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 06/23/2025 |
COT - HCBU - Building Progress |
|
Re-inspection required |
6-23-25: schedule inspection under development package (engineering). |
| 06/24/2025 |
COT - HCBU - Building Progress |
|
Partial Pass |
6-24-25: reinforcement/ground/ and schedule 40 electrical conduit for 5 light pole cages verified per plans. Okay to pour concrete. |
| 06/30/2025 |
COT - HCBU - Building Progress |
|
Not Ready |
6-30-25: called point of contact at 1015 and received no answer. Arrived on site at 1020 and did not locate contractor, however, notes indicated that engineering was to do inspection. I left site at 1030 hours. |
| 07/03/2025 |
COT - HCBU - Building Progress |
|
Not Ready |
|
| 08/04/2025 |
COT - HCBU - Building Progress |
|
Canceled |
Canceled per contractor. 8/4/2025 |
| 08/29/2025 |
COT - HCBU - Building Progress |
|
Passed |
|