Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-1224-02333
Inspection Description - ENGR Engineering Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2025 | ENGR Engineering Final | Partial Pass | Sidewalks progress is good. No issues currently. | |
| 08/27/2025 | ENGR Engineering Final | Partial Pass | bldg. 4, Starbucks. Paving is complete and good. Requesting erosion mitigation in semi-permanent drainage ditch between Starbucks and Hotel. Requested drainage relief at North end of paving. Advised to ensure positive drainage away from building at downspouts. | |
| 08/29/2025 | ENGR Engineering Final | Passed | Shell building is complete in accordance with approved plans. Okay for Letter of Completion. |