Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/24/2025 |
ENGR Engineering Final
|
|
Not Ready |
The engineering final was called for but the footing hasn't even been poured yet. Make sure to call all inspections needed for this job. Footing and rebar, pre grout at 4' hgt. Again at top of wall grout. |
| 03/12/2025 |
ENGR Engineering Final
|
|
Not Ready |
|
| 03/17/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Ready to grout top of wall |
| 03/26/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Still have some concrete spoils that need to be cleaned up. |
| 04/01/2025 |
ENGR Engineering Final
|
|
Passed |
CO Ready |