Parcel: 11206219B


Addresses:

2574 N CAMPBELL AV


Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Progress  

Permit Number - TC-COM-1223-02913

Inspection Description - COT - HCEL - Electrical Progress  

Inspection Status - Partial Pass

Date Description Inspector Results Comments
07/02/2024 COT - HCEL - Electrical Progress   Partial Pass
07/03/2024 COT - HCEL - Electrical Progress   Not Ready
07/09/2024 COT - HCEL - Electrical Progress   Partial Pass Partial approval for 4 inch conduit four secondary power, minus sweeps at building and at pole or transformer, ok to cover
7/9/24: (2)4" conduit from primary to transformer ok to backfill.(2)4" conduit for secondary's at transformer ok to backfill, 7 light pole bases per plan ok to proceed.
09/16/2024 COT - HCEL - Electrical Progress   Re-inspection required 9/16/24 please ground electrical boxes, brace and clamp roof drains, complete continuous plate at required areas, fire stop top plates...
09/17/2024 COT - HCEL - Electrical Progress   Partial Pass ok to insulate
11/08/2024 COT - HCEL - Electrical Progress   Passed