Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2026 | BULD - Electrical Clearance | Re-inspection required | 5.11.26 Permit only has one address, contractor wanted 9 units energized. Other addresses will need to be added. |