Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Permit Number - TC-COM-1223-02821

Inspection Description - BULD - Electrical Clearance

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
03/19/2025 BULD - Electrical Clearance Re-inspection required 3-19-25, per contractor, they will be changing out panels. An inspection is required prior to energizing them and panels must be labeled.
05/23/2025 BULD - Electrical Clearance Not Ready Will send pictures.
05/30/2025 BULD - Electrical Clearance Passed INCR
06/20/2025 BULD - Electrical Clearance Passed INCR