Inspection Status: Re-inspection required

Inspection History: COT - HCEL - Electrical Progress  

Date Description Inspector Results Comments
03/19/2025 COT - HCEL - Electrical Progress   Re-inspection required 3-19-25, per contractor, they will be changing out panels. An inspection is required prior to energizing them and panels must be labeled.
05/23/2025 COT - HCEL - Electrical Progress   Not Ready Will send pictures.
06/02/2025 COT - HCEL - Electrical Progress   Passed Clearance for Units 9, 10, 11, and 12. Phoned in to Natalie at 12:01.
Note: Work is only up to meter, thus not COT jurisdiction.
06/04/2025 COT - HCEL - Electrical Progress   Passed