Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 03/19/2025 |
BULD - Electrical Clearance |
|
Re-inspection required |
3-19-25, per contractor, they will be changing out panels. An inspection is required prior to energizing them and panels must be labeled. |
| 05/23/2025 |
BULD - Electrical Clearance |
|
Not Ready |
Will send pictures. |
| 05/28/2025 |
BULD - Electrical Clearance |
|
Passed |
INCR |