Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Framing
Permit Number - TC-COM-1222-00252
Inspection Description - COT - HCBU - Framing
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/23/2023 | COT - HCBU - Framing | Partial Pass | Sanctuary room west east and south walls only Including stage wing walls OK to two side | |
05/30/2023 | COT - HCBU - Framing | Partial Pass | for multi purpose room south stage wall ok for 2 side | |
06/01/2023 | COT - HCBU - Framing | Partial Pass | sanctuary north wall ok to 2 side, building F offices excluding conference room | |
06/09/2023 | COT - HCBU - Framing | Partial Pass | partial approval for multi purpose room ok to 2 side | |
06/16/2023 | COT - HCBU - Framing | Partial Pass | Looked at electrical intermediates and framing building D for rooms109 - 120 okay to one side drywall. 6/16/2023 | |
06/23/2023 | COT - HCBU - Framing | Partial Pass | Looked at electrical intermediates and framing building D for rooms109 - 120 okay to one side drywall. 6/16/2023 6/23/23: framing and rough elect for building D, north wall of "Main Street", and Next room at west end of Main Street. |
|
06/28/2023 | COT - HCBU - Framing | Partial Pass | 6-28-23: East of sanctuary. | |
07/06/2023 | COT - HCBU - Framing | Partial Pass | ||
07/25/2023 | COT - HCBU - Framing | Partial Pass | partial approval for restrooms wall framing in multi purpose room, soffit and hard lids to go | |
07/27/2023 | COT - HCBU - Framing | Partial Pass | south wall children’s theater ok to drywall and above ceiling rooms 116, 117, 118, 111,and 110 | |
COT - HCBU - Framing | Partial Pass | |||
08/01/2023 | COT - HCBU - Framing | Partial Pass | Walls for Theater, storage, restrooms, catering, and laundry. | |
08/10/2023 | COT - HCBU - Framing | Partial Pass | ||
08/14/2023 | COT - HCBU - Framing | Partial Pass | ||
08/16/2023 | COT - HCBU - Framing | Partial Pass | 8/16/2023 boys restroom room number 141 okay to proceed with hard lids. Room 108 intermediates okay to proceed. | |
08/17/2023 | COT - HCBU - Framing | Partial Pass | 8/17/2023 partial pass. Soffit in prayer room #151 okay to proceed. | |
08/18/2023 | COT - HCBU - Framing | Partial Pass | 8/18/2023 partial pass. Parapet wall Southwest of building from west to east stopping at tower. Okay to cover. | |
08/23/2023 | COT - HCBU - Framing | Partial Pass | 8/23/23 partial pass parapet north wall from west to east stopping at tower, tower not ready. | |
08/25/2023 | COT - HCBU - Framing | Canceled | Canceled per contractor. 8/25/2023 | |
08/28/2023 | COT - HCBU - Framing | Partial Pass | Two Dressing rooms in workroom 158. 8/28/2023 | |
08/30/2023 | COT - HCBU - Framing | Passed | Looked at electrical intermediates and framing building D for rooms109 - 120 okay to one side drywall. 6/16/2023 6/23/23: framing and rough elect for building D, north wall of "Main Street", and Next room at west end of Main Street. 6-28-23: East of sanctuary. 8/14/23 rm 120, 144, 143, 140 ok for hard lids and north wall for children's theater, ok drywall 8/10/2023 Rooms 110, 111, 115,116,117, 118, and 119 ok to install hard lids 7-6-23: South restrooms, theater, and playroom. 7/28/23: okay to cover furthest east wall from sanctuary electrical is ok do not cover plumbing walls Walls for Theater, storage, restrooms, catering, and laundry. 8/16/2023 boys restroom room number 141 okay to proceed with hard lids. Room 108 intermediates okay to proceed. 8/17/2023 partial pass. Soffit in prayer room #151 okay to proceed. 8/18/2023 partial pass. Parapet wall Southwest of building from west to east stopping at tower. Okay to cover. 8/23/23 partial pass parapet north wall from west to east stopping at tower, tower not ready. Canceled per contractor. 8/25/2023 Two Dressing rooms in workroom 158. 8/28/2023 8/30/23: Framing in front porch soffit covering drain plumbing passed from west end to tower, framing around 3 west wing columns around roof drain plumbing passed, framing at tower north, east and west passed. Framing at interior clouds in Main Street 100 passed. |
|
09/25/2023 | COT - HCBU - Framing | Partial Pass | 9/25/23: short interior platform Framing at FOH platform 103 pg.S300 per plan | |
09/28/2023 | COT - HCBU - Framing | Partial Pass | 9/25/23: short interior platform Framing at FOH platform 103 pg.S300 per plan 9/28/23: children theatre room 142 platform per plan , children theatre room 139platform per plan. Ok to proceed |
|
11/13/2023 | COT - HCBU - Framing | Partial Pass | #157 Stage platform, front of the house, base of platform. Three clouds in room #150. | |
COT - HCBU - Framing | Passed |