Permit: TC-COM-1222-00252

Parcel: 11941176H


Addresses:

1775 W AJO WY

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Framing

Date Description Inspector Results Comments
05/23/2023 COT - HCBU - Framing Partial Pass Sanctuary room west east and south walls only Including stage wing walls OK to two side
05/30/2023 COT - HCBU - Framing Partial Pass for multi purpose room south stage wall ok for 2 side
06/01/2023 COT - HCBU - Framing Partial Pass sanctuary north wall ok to 2 side, building F offices excluding conference room
06/09/2023 COT - HCBU - Framing Partial Pass partial approval for multi purpose room ok to 2 side
06/16/2023 COT - HCBU - Framing Partial Pass Looked at electrical intermediates and framing building D for rooms109 - 120 okay to one side drywall. 6/16/2023
06/23/2023 COT - HCBU - Framing Partial Pass Looked at electrical intermediates and framing building D for rooms109 - 120 okay to one side drywall. 6/16/2023
6/23/23: framing and rough elect for building D, north wall of "Main Street", and Next room at west end of Main Street.
06/28/2023 COT - HCBU - Framing Partial Pass 6-28-23: East of sanctuary.
07/06/2023 COT - HCBU - Framing Partial Pass
07/25/2023 COT - HCBU - Framing Partial Pass partial approval for restrooms wall framing in multi purpose room, soffit and hard lids to go
07/27/2023 COT - HCBU - Framing Partial Pass south wall children’s theater ok to drywall and above ceiling rooms 116, 117, 118, 111,and 110
COT - HCBU - Framing Partial Pass
08/01/2023 COT - HCBU - Framing Partial Pass Walls for Theater, storage, restrooms, catering, and laundry.
08/10/2023 COT - HCBU - Framing Partial Pass
08/14/2023 COT - HCBU - Framing Partial Pass
08/16/2023 COT - HCBU - Framing Partial Pass 8/16/2023 boys restroom room number 141 okay to proceed with hard lids. Room 108 intermediates okay to proceed.
08/17/2023 COT - HCBU - Framing Partial Pass 8/17/2023 partial pass. Soffit in prayer room #151 okay to proceed.
08/18/2023 COT - HCBU - Framing Partial Pass 8/18/2023 partial pass. Parapet wall Southwest of building from west to east stopping at tower. Okay to cover.
08/23/2023 COT - HCBU - Framing Partial Pass 8/23/23 partial pass parapet north wall from west to east stopping at tower, tower not ready.
08/25/2023 COT - HCBU - Framing Canceled Canceled per contractor. 8/25/2023
08/28/2023 COT - HCBU - Framing Partial Pass Two Dressing rooms in workroom 158. 8/28/2023
08/30/2023 COT - HCBU - Framing Passed Looked at electrical intermediates and framing building D for rooms109 - 120 okay to one side drywall. 6/16/2023
6/23/23: framing and rough elect for building D, north wall of "Main Street", and Next room at west end of Main Street.

6-28-23: East of sanctuary.
8/14/23 rm 120, 144, 143, 140 ok for hard lids and north wall for children's theater, ok drywall

8/10/2023 Rooms 110, 111, 115,116,117, 118, and 119 ok to install hard lids

7-6-23: South restrooms, theater, and playroom.
7/28/23: okay to cover furthest east wall from sanctuary electrical is ok do not cover plumbing walls

Walls for Theater, storage, restrooms, catering, and laundry.

8/16/2023 boys restroom room number 141 okay to proceed with hard lids. Room 108 intermediates okay to proceed.

8/17/2023 partial pass. Soffit in prayer room #151 okay to proceed.

8/18/2023 partial pass. Parapet wall Southwest of building from west to east stopping at tower. Okay to cover.

8/23/23 partial pass parapet north wall from west to east stopping at tower, tower not ready.

Canceled per contractor. 8/25/2023

Two Dressing rooms in workroom 158. 8/28/2023

8/30/23: Framing in front porch soffit covering drain plumbing passed from west end to tower, framing around 3 west wing columns around roof drain plumbing passed, framing at tower north, east and west passed. Framing at interior clouds in Main Street 100 passed.
09/25/2023 COT - HCBU - Framing Partial Pass 9/25/23: short interior platform Framing at FOH platform 103 pg.S300 per plan
09/28/2023 COT - HCBU - Framing Partial Pass 9/25/23: short interior platform Framing at FOH platform 103 pg.S300 per plan
9/28/23: children theatre room 142 platform per plan , children theatre room 139platform per plan. Ok to proceed
11/13/2023 COT - HCBU - Framing Partial Pass #157 Stage platform, front of the house, base of platform. Three clouds in room #150.
COT - HCBU - Framing Passed