Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2023 | COT - HCPL - Rough Soil | Passed | New soil lines and cold water copper lines ok to cover |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2023 | COT - HCPL - Rough Soil | Passed | New soil lines and cold water copper lines ok to cover |