Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2024 | COT - HCEL - Electrical Underground | Not Ready | No electrical can be run longitudinally through footers | |
| 01/11/2024 | COT - HCEL - Electrical Underground | Partial Pass | No electrical can be run longitudinally through footers 1/11/24: electrical underground in slab passed ok to backfill. (2) 4" conduit and (1) 2" conduit from secondary to building. Ok to backfill 1/11/24: Preslab reinforcement per plan at trash enclosure. Ok to pour. |
|
| 01/17/2024 | COT - HCEL - Electrical Underground | Partial Pass | No electrical can be run longitudinally through footers 1/11/24: electrical underground in slab passed ok to backfill. (2) 4" conduit and (1) 2" conduit from secondary to building. Ok to backfill 1/11/24: Preslab reinforcement per plan at trash enclosure. Ok to pour. 1/17/24: electrical conduit running longitudinally will be running overhead. Revision will need to be submitted. Ok to proceed |
|
| COT - HCEL - Electrical Underground | Passed |