Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/14/2026 |
ENGR Engineering Final
|
|
Not Ready |
A revised drawing indicating that north column will remain as existing, and a letter from the Engineer stating that the wall has been constructed per design are required to close this permit. Construction completed with no inspections of footing, bond beam, or grouting. |