Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCEL - Grounding/BondingĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2025 | COT - LCEL - Grounding/BondingĀ | Passed | ||
| 12/16/2024 | COT - LCEL - Grounding/BondingĀ | Partial Pass | X4 1/0 landing at disconnect, radio, radio tower, and provisional space. #6 bare is for a/c, SEP, well pump panel, inside transformer, and 120/240 panel. Ground loop around control building, then tied into well pad. (Casing). 12/16/2024 Contact is Angel 520 971 9480 |