Inspection Status: Passed
Inspection History: COT - LCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2025 | COT - LCEL - Electrical Underground | Passed | All underground electrical is complete | |
| 12/16/2024 | COT - LCEL - Electrical Underground | Partial Pass | 1 1/2" conduit to chlorinator. X2 3/4" from well pump panel. The other is for circuit panel. 1 1/2" is from SEP (station control panel) 1" is for thermostat junction box. 3/4" station control panel. 1 1/2" from flow transmitter to flow meter. 2 spares 1". 2 1/2" from well pump panel to well pad motor. 1" from provisional space. 3/4" from circuit breaker. Conduit for fiber optics x2 1", x1 4", x3 1" to solar field. X2 3" from transformer to new CT can. Okay to backfill progress areas. Shading is required. 12/16/2024 Contact is Angel 520 971 9480 |