Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2025 | COT - LCBU - Framing | Partial Pass | 1/14/25: framing hold down and studs per plan ok to proceed. electrical in wall per plan ok to proceed with 1-side. | |
| 01/22/2025 | COT - LCBU - Framing | Passed |