Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-1124-02172

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
03/14/2025 ENGR Engineering Final Not Ready Once all gates are completed in 1st phase and refuse enclosure is completed I can release the 1st 2 rows of the 1st phase.
04/04/2025 ENGR Engineering Final Partial Pass 04/04/25, Partial pass on the first two rows only. The rest of the facility needs to be gated off while fence construction is still going on.