Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-1124-02172
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2025 | ENGR Engineering Final | Not Ready | Once all gates are completed in 1st phase and refuse enclosure is completed I can release the 1st 2 rows of the 1st phase. | |
| 04/04/2025 | ENGR Engineering Final | Partial Pass | 04/04/25, Partial pass on the first two rows only. The rest of the facility needs to be gated off while fence construction is still going on. |