Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - HCEL - Electrical Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 05/28/2024 |
COT - HCEL - Electrical Above Ceiling |
|
Re-inspection required |
Provide seismic wire for all above ceiling lights on opposite ends. Remove abandoned wire (conduit). Provide labeling at j boxes. Support mc cable off the grid. 5/28/2024 |
| 05/31/2024 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
|
| 06/17/2024 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
|
| 09/06/2024 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
From grid line 4 to the east East above ceiling complete, label VAV disconnects please verify barometric dampers are installed in functioning to rooftop down shots in two locations on the east side at final |
| 09/30/2024 |
COT - HCEL - Electrical Above Ceiling |
|
Re-inspection required |
9-30-24, see previous notes. Reinspection required. |
| 10/03/2024 |
COT - HCEL - Electrical Above Ceiling |
|
Passed |
|