Inspection Status: Not Ready
Inspection History: COT - HCPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/01/2025 |
COT - HCPL - Plumbing Final |
|
Not Ready |
|
|
COT - HCPL - Plumbing Final |
|
Re-inspection required |
8/22/25: Air gaps required throughout at discharge of condensate in bathroom, filtration system. Approved piping required for pressure relief valve, possible leak at filtration system. Water sterilization report requires resubmit. All plumbing fixtures must be installed. |
| 09/05/2025 |
COT - HCPL - Plumbing Final |
|
Re-inspection required |
9/5/25: Air gaps required throughout at discharge of condensate in bathroom, filtration system. Leak at ice maker, clean out caps required at all exterior clean outs. Pending water sterilization report and engineering final. |
| 09/24/2025 |
COT - HCPL - Plumbing Final |
|
Passed |
|