Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
01/22/2026 ENGR Engineering Final Not Ready Special Inspection Certs still missing
08/01/2025 ENGR Engineering Final Not Ready Not ready. Accessible restroom required. Address open venting. enclosed exposed building wrap at base of FBB. Satisfy conditions on permit.
08/13/2025 ENGR Engineering Final Not Ready
08/22/2025 ENGR Engineering Final Partial Pass 8/22/25
Correct Water sterilization report needs to be resubmitted. Okay for TCO level 1.
09/05/2025 ENGR Engineering Final Not Ready
12/08/2025 ENGR Engineering Final Partial Pass Okay for level 4 TCO