Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2023 | BULD - Electrical Clearance | Passed | Approved, DGL/DGC Clearance is required for the solar meter and line-side tap |