Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2023 | COT - LCBU - Framing | Not Ready | ||
| 04/18/2023 | COT - LCBU - Framing | Not Ready | 4/18/23: not ready. Do not call for intermediate until all trades are ready for inspection. | |
| 04/27/2023 | COT - LCBU - Framing | Re-inspection required | 4/18/23: not ready. Do not call for intermediate until all trades are ready for inspection. 4/27/23: Extend all vent piping to above ceiling tiles in the wall. Install plumbing per engineered drawings. |
|
| 04/28/2023 | COT - LCBU - Framing | Passed |