Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/27/2026 |
ENGR Engineering Final
|
|
Not Ready |
Pedestrian circulation between the trailer and the building has been blocked. This needs to be corrected prior to calling in for final inspection. |
| 05/01/2026 |
ENGR Engineering Final
|
|
Passed |
Project is completed in accordance with approved plans. |