Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2026 | ENGR Engineering Final | Not Ready | No site work on project. Work is substantially complete and site is safe and accessible. Unsatisfied conditions: -Contractor said Air Balancing had been and submitted- if so it needs processed to show as satisfied prior to final. -Water Sterilization Report not done, needs to be submitted and processed to show as satisfied prior to final. |
|
| 08/07/2026 | ENGR Engineering Final | Partial Pass | Air Balancing Documents and Water Sterilization Report should be satisfied prior to final inspection. When satisfied schedule final inspections. | |
| 08/19/2026 | ENGR Engineering Final | Partial Pass | Site is complete. Contractor is submitting the documents for the air balancing, and water sterilization conditions. Okay to apply for TCO level 1, pending other final inspections. | |
| 08/27/2026 | ENGR Engineering Final | Passed | Site is complete and conditions have been satisfied. |