Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
07/17/2026 ENGR Engineering Final Not Ready No site work on project. Work is substantially complete and site is safe and accessible.
Unsatisfied conditions:
-Contractor said Air Balancing had been and submitted- if so it needs processed to show as satisfied prior to final.
-Water Sterilization Report not done, needs to be submitted and processed to show as satisfied prior to final.
08/07/2026 ENGR Engineering Final Partial Pass Air Balancing Documents and Water Sterilization Report should be satisfied prior to final inspection. When satisfied schedule final inspections.
08/19/2026 ENGR Engineering Final Partial Pass Site is complete. Contractor is submitting the documents for the air balancing, and water sterilization conditions. Okay to apply for TCO level 1, pending other final inspections.
08/27/2026 ENGR Engineering Final Passed Site is complete and conditions have been satisfied.