Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/04/2026 |
COT - LCBU - Building Final |
|
Re-inspection required |
2-4-26: called and left voice mail at 1232pm. Arrived on site at 1240 and waited 10 minutes for access. Left at 1251pm-rescheduled when ready. |
| 02/05/2026 |
COT - LCBU - Building Final |
|
Re-inspection required |
2-5-26: compact pad and clean out any loose dirt from footings, tie rebar, and install dobies. |
| 02/11/2026 |
COT - LCBU - Building Final |
|
Partial Pass |
2-11-26: corrections made. Okay for concrete placement. |
|
COT - LCBU - Building Final |
|
Re-inspection required |
3-27-26: 1/2" threshold maximum required at exterior door, add a 3'x3' landing at exterior door, and either submit a revision for the extra exterior light fixture or remove altogether, remove excess concrete around slab, missing double steel door, provide an updated panel schedule, complete landscaping, and have a licensed contractor submit a letter to the city documenting that drywall screws were installed per plans or reschedule an inspection using "magnets" to verify screw spacing. |
| 04/08/2026 |
COT - LCBU - Building Final |
|
Partial Pass |
4-8-26: partial pass pending revision/ letter related to omitting the double steel doors on interior side of building. |