Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/25/2026 |
ENGR Engineering Final
|
|
Not Ready |
Site work is complete. However there is temporary fencing, connex box and porta potty that need to be removed. In addition the condition requiring ADEQ to sign off needs to be satisfied. Reschedule when ready. |