Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | BULD - Electrical Clearance | Re-inspection required | 1/22/26: Revision required for changes in conductor size at main panel and location of sub-panel must be appropriately identified on plan set, bond bushings required at raceway, conductors at panel must be protected from abrasion at raceway, EMT must be appropriately secured throughout, | |
| 06/09/2026 | BULD - Electrical Clearance | Passed | 06/09/2026 Clearance TEP INCR for 100A MPU. |